Groundwork for a mini-pitch in Selb, Germany

For planners and contractors Everything you need to plan

EN 15312
TÜV GS-tested
DIN 18035
sub-base to Part 7, as in sports-ground construction
0
foundations with the Advanced*
11–12
pages of installation requirements

Well planned is half built

Whether you are a landscape architect, a council's planning office or a contractor: planning a mini-pitch needs reliable requirements for sub-base and foundations, the certificates for acceptance and a contact who knows the details. Here are the documents we provide for that.

The sub-base and socket foundations are usually built by a local contractor to our construction plan. We deliver the board system; our team can install it, or the customer installs it themselves.

What planners ask us

Standards

Tested and certified

The complete system is tested by TÜV Rheinland to EN 15312 for freely accessible multi-sport equipment and carries the GS mark. The certificates are available to download below.

Sub-base

Sub-base to sports-ground standards

For the Classic the soil is excavated, filled with sand, gravel and chippings and compacted, as in sports-ground construction to DIN 18035 Part 7. The supplementary sheets show build-up, grading and evenness for turf with an elastic layer, with shock pads and for synthetic surfaces.

Foundations

Set in concrete or free-standing

The Classic stands with posts in concrete socket foundations, the Advanced usually without foundations on a level, load-bearing surface such as asphalt or concrete. The comparison of the two systems helps you choose.

Sizes

Sizes and goals

Standard sizes from 15 x 10 m to 40 x 20 m with goals of 3 x 2 m or 5 x 2 m, any other size on request. The goals with doors are TÜV-approved as emergency exits.

Tender

Texts for your tender

We send you tender texts for the bill of quantities and drawings as PDF for your project.

Operation

Maintenance to EN 15312

The guide to regular visual inspection and maintenance to EN 15312 is part of the operator's documents; spare parts come straight from the manufacturer.

The systems at a glance

The installation requirements differ mainly in how the system stands on the ground.

Classic or Advanced? The comparison →

How it works

How a project runs

1. Advice and quote: you send the site plan and ground conditions, we suggest system and size.

2. Planning: you receive the construction plan and installation requirements for sub-base and foundations.

3. Groundwork: a local contractor builds the sub-base and foundations.

4. Installation: we deliver the board system and install it, or you install it yourself.

5. Handover: with the TÜV certificate and the maintenance guide for the operator.

Which size?

From 15 x 10 m for 3 v 3 to 40 x 20 m for 7 v 7. The DFB size is 20 x 13 m. Any other size is available on request.

  • 15 x 10 m 3 v 3
  • 20 x 13 m 4 v 4
  • 30 x 15 m 5 v 5
  • 40 x 20 m 6 v 6 to 7 v 7
All sizes compared →
Configurator

Design your pitch

Choose the model, size, colours, netting and surface, keep your design as a PDF and request a free, no-obligation quote.

Design your pitch

Downloads

Talk to our engineers

Send us the site plan, measurements and ground conditions. We answer your technical questions and send you tender texts and drawings for your project.